+8615905360672

huaquan@huaquanpower.com

SHANDONG HUAQUAN POWER CO.,LTD

Industry informationHome>Industry information > Storage precautions for Integrated Generator

Storage precautions for Integrated Generator

Time:2025-03-31 15:41:04  Edit:HuaQuan
When storing an Integrated Generator, in order to ensure its stable performance and extend its usage time, the following precautions should be taken:
Integrated Generator
1、 Selection of Storage Environment for Integrated Generator
Dry and ventilated:
Choose a dry and well ventilated place for storage to avoid rusting or corrosion of internal parts of the generator in a humid environment. A humid environment may also cause electrical faults, affecting the normal use of the generator.
Avoid direct sunlight:
Do not expose the generator to direct sunlight to prevent aging, deformation, or fading of the casing. Long term direct sunlight may also affect the internal temperature of the generator, thereby affecting its performance.
Stay away from corrosive substances:
The storage location should be away from corrosive substances such as acid and alkali to avoid damage to the generator.
Integrated Generator
2、 Preparation before storing the Integrated Generator
Cleaning:
Before storage, the generator should be thoroughly cleaned to remove impurities such as dust and oil stains. When cleaning, be careful to avoid moisture entering the interior of the generator to prevent short circuits or damage.
Check fasteners:
Check all fasteners (such as bolts, nuts, etc.) of the integrated generator for looseness or loss, and tighten or replace them promptly if necessary.
Fuel treatment:
If there is still fuel inside the generator, it is recommended to release it and store it properly to prevent the fuel from deteriorating or evaporating and causing damage to the generator. If stored for a long time, an appropriate amount of stabilizer can be added to the fuel to extend its shelf life.
Battery maintenance:
For generators equipped with batteries, the negative terminal of the battery should be disconnected to prevent self discharge of the battery and depletion of power. Regularly charge the battery to keep it fully charged and extend its lifespan.
 
3、 Maintenance during storage of Integrated Generator
Regular inspection:
Check the generator at regular intervals (such as monthly) to ensure that it is in good condition.
The inspection includes appearance, fasteners, fuel system, cooling system, etc.
Avoid heavy pressure:
Do not stack heavy objects on the integrated generator to avoid crushing it or affecting its performance.
Integrated Generator
4、 Preparation for Enabling Integrated Generator after Storage
Comprehensive inspection:
Before restarting the integrated generator, a comprehensive inspection should be conducted to ensure that all components are in good condition.
The inspection includes fuel system, cooling system, electrical system, lubrication system, etc.
Replace the lubricating oil and filter of the Integrated Generator:
According to the usage situation, replace the lubricating oil and filter in a timely manner to ensure the lubrication and filtration effect of the generator.
Test Run:
Before formal use, conduct a short-term test run to observe the operating status and various performance indicators of the generator to see if they are normal.
More information on Integrated Generator:http://www.wf-fadianji.com/

Sales hotline: +86 15905360672
WeChat customer service: +86 15905360672
Email address: huaquan@huaquanpower.com
Official website: https://www.huaquanpower.com
Production Base: No. 11666 Guting Street, Economic Development Zone, Weifang City, Shandong Province
Company Name:SHANDONG HUAQUAN POWER CO.,LTD